Presentation sample
Working slide outline for Friday 2026-09-04 19:00 Europe/Berlin. Not official Quantic dashboard text. Not a claim that NFR-1 / NFR-2 timings or a four-browser NFR-7 matrix are met.
Use with Coverage (every freeze ID) and the Friday plan diagram. Spoken timing lives in the video script. Saturday recording cuts (three ~10 min variants): Presentation. This file stays the 8/12-slide outline.
Default for the room: the 8-slide cut. The 12-slide outline is if someone asks for more FR walkthrough.
12-slide outline (8–12 range)
| # | Slide | Say / show | Honesty |
|---|---|---|---|
| 1 | Title | Café Fausse. Knowledge + App. Friday score-5 working reference. | This site is not the restaurant. |
| 2 | Two surfaces | Knowledge = knowledge.cafe.artof.link (HTTPS live). App = prefer https://cafe.artof.link/ this session. | Lightsail staging #57 — not production forever. #22 stays Future. |
| 3 | Scope / grade floor | Official SRS only: FR-1..FR-18, NFR-1..NFR-9. | No FR-19 / NFR-10. Freeze data stays frozen. |
| 4 | Architecture | Stack staging HLD: Knowledge Pages vs Lightsail cafe-fausse-staging vs dashed #22. | Weekend #57 is live; #22 stays Future. |
| 5 | FR map | Coverage table. Code + CI for the functional rows. | Evidence class is on the table. |
| 6 | Home + Menu | FR-1..FR-5. Play clips/01-home-menu.mp4. | Clip = look, not a public-host probe. |
| 7 | Reservations | FR-6..FR-9, FR-17..FR-18. Play clips/02-happy-book.mp4. 30 tables. Full slot = FR-9 error. | Fail closed if DB is missing. |
| 8 | Newsletter + About / Gallery | FR-15..FR-16; FR-10..FR-14 (history, founders, awards, lightbox). | Awards and reviews are freeze quotes. |
| 9 | Live or fallback | HTTPS Knowledge. Prefer https://cafe.artof.link/. Clips if staging drops. | Staging #57, not production forever. |
| 10 | NFR honesty | NFR-5 / NFR-6: code + CI + local J6/J8. J9 PASS Vite-only. NFR-7 partial (Edge + Firefox home; Chrome/Safari Unknown). NFR-1 / NFR-2: Unknown as SRS-budget claims (#40 / #44). | Do not say “NFR-1/2 met” or “four browsers.” |
| 11 | AI tooling | docs/ai-tooling.md. Cursor + GitHub Actions. Author does not merge. | MRC COMMENT is role-approve; then cursor[bot] merge after green + Bugbot. |
| 12 | Future close | #22, #34–#38 = Future / hardening. Not grade gaps. Friday locked access + video/scenarios. | Questions. Stay on the freeze. |
8-slide cut (use this Friday)
| # | Slide | Merge from the long outline |
|---|---|---|
| 1 | Title + two surfaces | Slides 1–2. Knowledge HTTPS vs prefer https://cafe.artof.link/ (staging #57, not production forever). |
| 2 | Scope | Slide 3. FR-1..FR-18 / NFR-1..NFR-9 only. |
| 3 | Architecture | Slide 4. Knowledge / weekend staging / permanent #22. |
| 4 | FR coverage + clips | Slides 5–6. Coverage table + clip 01 (Home → Menu). |
| 5 | Reservations + newsletter | Slides 7–8. Clip 02. Mention About/Gallery IDs in one sentence. |
| 6 | Live or fallback | Slide 9. HTTPS / local / clips. |
| 7 | NFR honesty | Slide 10. J1–J8 local PASS; J9 PASS Vite-only; NFR-7 partial; NFR-1 / NFR-2 not-claimed-met. |
| 8 | AI tooling + Future close | Slides 11–12. Tooling log. #22 / #34–#38 ≠ missing SRS. |
What not to put on a slide
- “Journey 1–9 passed” as a single stamp (J1–J8 is Flask+DB; J9 is Vite-only), or any NFR-1 / NFR-2 / four-browser NFR-7 met mark. Coverage / #40 / #44: J1–J8 local PASS; J9 PASS Vite-only; NFR-7 partial.
- “Production-forever restaurant at
cafe.artof.link.” Prefer it as the weekend staging share (#57). - FS extras (#34–#38) as if they were official requirements.
- A fifth team, GitLab, AWS in the MVP cut, or invented IDs.
Speaker props
- Browser tab:
https://knowledge.cafe.artof.link/(this map). - Browser tab: prefer
https://cafe.artof.link/(GET 200 this session). Backuphttps://<STAGING_IP_DASHED>.sslip.io/. Clips if staging drops. - This page + video script scenario A–F.