Quantic deliverable handoff
In plain English: This is the one-page pack to paste or open when someone asks “where is the assignment?” It is not the restaurant and not the official Quantic dashboard. Sister pages stay complete. This page links out.
Grade floor = official SRS only (FR-1..FR-18, NFR-1..NFR-9). Do not invent FR-19. NFR-1 / NFR-2 are met on the A36 Brave broadband probes (466 ms / 233 ms, #124 / #126). NFR-7 stays Partial. Do not claim four browsers.
Every section below is filled with what is known now. Rows that are not done yet stay Unknown / to-be-filled. Do not invent a submit video, a voice-over, or an outbound mailer.
1. Links (known now)
| What | URL | Known now |
|---|---|---|
| GitHub repo | artofdream/aea-interactive-design | Tracker + CI are GitHub only. No GitLab. Public repo. Issues → Slack; Claude addresses. |
| Restaurant app | https://cafe.artof.link/ | Prefer this share. Lightsail staging #57 — not forever production. Health: /api/health. Operator: /operator. Permanent hosting stays #22. |
| Knowledge map | https://knowledge.cafe.artof.link/ | GitHub Pages. This session HTTPS GET 200. |
| Quantic hub | https://knowledge.cafe.artof.link/quantic.html | Delivery / MSAIE navigation only (#74 / #79). |
| To-be (beyond MVP) | To-be | Not the grade floor. Parked Future #22 / #34–#38. Sister page Future stays complete. |
Interim App backup (same host, not the primary paste): https://<STAGING_IP_DASHED>.sslip.io/. Old tunnels (shaky-deer-drive, happy-glasses-film, real-goats-shop) are stale.
Live Pages URLs for pages that land only after this PR merges (/glossary.html, /meeting-*.html, /quantic-handoff.html) stay Unknown until a GET after deploy.
2. Sources / PDF refs (known now)
- Official SRS PDF (source of truth): `docs/official/MSEE_Web_Application_and_Interface_Design_Cafe_Fausse_SRS.pdf` (SHA256
6075e5964601aa3e3c7a3085c626eab820e3d733a396b00e20339cfdc77a9d82). Fetched 2026-08-31 HTTP 200. CI fails closed if missing or the hash mismatches. - Working freeze: SRS freeze and full copy
docs/srs.md(srs-full.html). FR-1..FR-18, NFR-1..NFR-9 only. - Evidence map: Coverage — each freeze ID, where it lives in-repo, evidence class (code / CI / local UX / Unknown).
- Honesty ledger: Honesty — a status word needs a probe this session or stays Unknown.
- Must-film page: Must-film shots — four camera beats. Committed on
mainvia #83 / PR #84. Livehttps://knowledge.cafe.artof.link/must-film-shots.htmlwas Unknown until a GET after that deploy; re-probe next session or write Unknown. - Short labels: Glossary.
- UX compliance: Café Fausse App mobile ≤767px — #91 / PR #93. Knowledge mobile ≤767px — #92 / PR #94. NFR-1 / NFR-2 met cites stay on Coverage (A36 Brave broadband 466 ms / 233 ms). Do not claim four-browser NFR-7.
3. Coverage vs the talk track (known now)
Coverage is the grade-floor map. Open it when a grader asks “where is FR-9?” or “is NFR-6 tested?” It is not a slide deck.
Meghna first: Meghna materials (index + silent PROTOTYPE) · Meghna cafe demo · Meghna VO draft. Spoken / VO = plain English only. FR/NFR IDs stay in supporting notes (and Coverage). Recorded teammate VO is Unknown. Supporting docs target 9:00 America/New_York on 2026-09-06.
Parts 3–5 rehearsal (after Meghna): Parts 3–5 materials (index + silent PROTOTYPEs + technical PROTOTYPE TTS + PROTOTYPE TTS natural). Talk spine: Part 2 UX/business · Part 3 architecture why/how · Part 4 coding why/how · Part 5 honesty. Casting: Meghna Part 2 UX · Claude Part 3 Architecture (Variant B) · Hiren Part 4 Coding (Variant C). Prefer natural for camera: Part 3 natural / VO · Part 4 natural / VO · Part 5 natural / VO. Technical compare: Part 3 / VO · Part 4 / VO · Part 5 / VO. Architect deploy table: Local vs AWS (also on Stack). Architect visuals: HLD + Meghna FE/BE · Part 4 coding overview. FR/NFR map: Parts 3–5 handoff mapping — not spoken on camera. Silent and TTS mp4s are PROTOTYPE / rehearsal — not Quantic submit. PROTOTYPE TTS is machine voice (en-US-GuyNeural), not teammate VO. Recorded teammate VO Unknown.
Locked Saturday VIDEO (~10 min) — owner notes 2026-09-05 / #97. Not “pick one of A / B / C.”
- Team + ID verification — ~30s — shared
- Website demo
https://cafe.artof.link/— ~3 min — Meghna — Home, Gallery, Menu, Reservations — pack: Meghna demo - Architecture + Diagram (Variant B) — ~3 min — Claude Part 3 — camera natural script
- Coding rationale (Variant C) — ~3 min — Hiren Part 4 — camera natural script
- Shared close — shared — camera natural script
Casting: Meghna Part 2 UX · Claude Part 3 Architecture (Variant B) · Hiren Part 4 Coding (Variant C). Voice-over is TBD. Meghna’s 3-minute pack: Meghna demo. Per-part pack (script + prototype video + VO TBD) lives on Saturday. Supporting docs target 9:00 America/New_York on 2026-09-06.
Sister talk-track pages (stay complete):
- Meghna materials — index + silent PROTOTYPE clip.
- Meghna demo — 3-min live walk (spoken = plain English).
- Meghna VO draft — plain-English voice-over. Recorded take Unknown.
- Parts 3–5 materials — Architecture / Coding / shared-close index + silent PROTOTYPEs + technical PROTOTYPE TTS + PROTOTYPE TTS natural. Prefer natural for camera. VO notes. HLD + Meghna FE/BE · coding overview · developer system map. Recorded teammate VO Unknown.
- Handoff mapping — FR/NFR / probe IDs — not spoken on camera
- Camera (natural): Part 3 script · Part 3 VO · Part 4 script · Part 4 VO · Part 5 script · Part 5 VO
- Compare (technical): Part 3 script · Part 3 VO · Part 4 script · Part 4 VO · Part 5 script · Part 5 VO
- Talk cuts — Variant B and Variant C as 3-min sources; Variant A remains a draft. Shared open / close stay here.
- Slide outline — 12-slide outline + 8-slide cut. Friday deck, not a second talk track.
- Video script — timed beats + scenario menu A–F. Zoom dry-run v2 on that page is PROTOTYPE.
- Must-film shots — four camera beats on
cafe.artof.link: (1) happy book →/operator, (2) newsletter → newsletter-only, (3) full-book HTTP 409, (4) NFR-6 via Coverage/CI.
The Zoom dry-run is not the Quantic submission. Do not submit it until a live must-film pass plus voice exists. That final submit cut is Unknown / to-be-filled.
| Track | Job (known) | Not (honest) |
|---|---|---|
| Coverage | FR/NFR evidence map (grade floor) | A claim that every NFR is met |
| Talk / video / must-film | Locked five-part structure; Meghna P2 / Claude P3 / Hiren P4; must-film page exists; dry-run is PROTOTYPE | A finished Quantic upload; a voice-over |
4. Honesty (known now — say out loud)
cafe.artof.linkis the staging environment for the MSAIE project (temporary — not production forever). Off-camera tracker #57. Staging stays up until Quantic scoring is done, or the owner overrides tear-down (owner lock 2026-09-09). Knowledge Pages stay up the same window.- NFR-1 is met — A36 Brave broadband cold Home 466 ms (#124). NFR-2 is met — reservation submit 233 ms (#126). Local Vite notes (56 ms / 32 ms) and the ROG Wi‑Fi note are not those met cites.
- NFR-7 is Partial. Not a four-browser pass. Full matrix on Coverage / Honesty.
/operatoris not FR-19. Read-only recording helper (PR #58 / issue #54). Preferhttps://cafe.artof.link/operator. Not an admin console.- Newsletter is FR-15 / FR-16 store/register only. Outbound mail is not in the SRS MVP — Unknown as a product feature because it is out of freeze, not because we forgot to look.
- Journey J1–J8 PASS was local cts-ai with the DB up (2026-09-02). J9 PASS is Vite-only. Neither is a public-host write probe.
- Whether Quantic graders need the host up for video evaluation remains Unknown until the owner shares correspondence.
5. Still Unknown / to-be-filled (sections kept on purpose)
Do not invent these. The section exists so a grader sees the gap instead of a guessed yes.
| Item | Status now |
|---|---|
| Final Quantic submission video (live must-film + voice) | Unknown / to-be-filled. Dry-run on the Video script is PROTOTYPE only. |
| Voice-over (teammate recorded) | TBD on every part. PROTOTYPE TTS on materials is not that. |
| Optional Claude advance recording for eval | Unknown until a file exists. Not the submit video. |
| Sunday meeting start clock | Unknown / to-be-filled. Known job: ends with a recording; docs target 9:00 America/New_York on 2026-09-06. Page: Sunday. |
| Outbound newsletter mail | Not in the SRS MVP. Do not claim a mailer. |
Permanent cafe.artof.link hosting | Future #22. Staging does not close it. |
Collaborator quantic-grader | Owner step. An agent must not add that person. |
| Live GET of this handoff page on Pages | Unknown until after merge / deploy. |
Meeting packs
- Wednesday — 2026-09-02 19:00 Europe/Berlin; owner locked 1, 3, 4.
- Friday — 2026-09-04 19:00 Europe/Berlin; score-5 / tech access.
- Saturday — 2026-09-05 19:00 Europe/Berlin / ~13:00 America/New_York; locked five-part VIDEO (#97).
- Sunday — 2026-09-06; ends with a recording; supporting docs target 9:00 America/New_York; remaining gaps stay Unknown / to-be-filled.
Back to the Quantic / MSAIE hub.