Café Fausse knowledge map

Not the restaurant. MVP = official SRS freeze.

Quantic deliverable handoff

In plain English: This is the one-page pack to paste or open when someone asks “where is the assignment?” It is not the restaurant and not the official Quantic dashboard. Sister pages stay complete. This page links out.

Grade floor = official SRS only (FR-1..FR-18, NFR-1..NFR-9). Do not invent FR-19. NFR-1 / NFR-2 are met on the A36 Brave broadband probes (466 ms / 233 ms, #124 / #126). NFR-7 stays Partial. Do not claim four browsers.

Every section below is filled with what is known now. Rows that are not done yet stay Unknown / to-be-filled. Do not invent a submit video, a voice-over, or an outbound mailer.

1. Links (known now)

WhatURLKnown now
GitHub repoartofdream/aea-interactive-designTracker + CI are GitHub only. No GitLab. Public repo. Issues → Slack; Claude addresses.
Restaurant apphttps://cafe.artof.link/Prefer this share. Lightsail staging #57 — not forever production. Health: /api/health. Operator: /operator. Permanent hosting stays #22.
Knowledge maphttps://knowledge.cafe.artof.link/GitHub Pages. This session HTTPS GET 200.
Quantic hubhttps://knowledge.cafe.artof.link/quantic.htmlDelivery / MSAIE navigation only (#74 / #79).
To-be (beyond MVP)To-beNot the grade floor. Parked Future #22 / #34–#38. Sister page Future stays complete.

Interim App backup (same host, not the primary paste): https://<STAGING_IP_DASHED>.sslip.io/. Old tunnels (shaky-deer-drive, happy-glasses-film, real-goats-shop) are stale.

Live Pages URLs for pages that land only after this PR merges (/glossary.html, /meeting-*.html, /quantic-handoff.html) stay Unknown until a GET after deploy.

2. Sources / PDF refs (known now)

3. Coverage vs the talk track (known now)

Coverage is the grade-floor map. Open it when a grader asks “where is FR-9?” or “is NFR-6 tested?” It is not a slide deck.

Meghna first: Meghna materials (index + silent PROTOTYPE) · Meghna cafe demo · Meghna VO draft. Spoken / VO = plain English only. FR/NFR IDs stay in supporting notes (and Coverage). Recorded teammate VO is Unknown. Supporting docs target 9:00 America/New_York on 2026-09-06.

Parts 3–5 rehearsal (after Meghna): Parts 3–5 materials (index + silent PROTOTYPEs + technical PROTOTYPE TTS + PROTOTYPE TTS natural). Talk spine: Part 2 UX/business · Part 3 architecture why/how · Part 4 coding why/how · Part 5 honesty. Casting: Meghna Part 2 UX · Claude Part 3 Architecture (Variant B) · Hiren Part 4 Coding (Variant C). Prefer natural for camera: Part 3 natural / VO · Part 4 natural / VO · Part 5 natural / VO. Technical compare: Part 3 / VO · Part 4 / VO · Part 5 / VO. Architect deploy table: Local vs AWS (also on Stack). Architect visuals: HLD + Meghna FE/BE · Part 4 coding overview. FR/NFR map: Parts 3–5 handoff mapping — not spoken on camera. Silent and TTS mp4s are PROTOTYPE / rehearsal — not Quantic submit. PROTOTYPE TTS is machine voice (en-US-GuyNeural), not teammate VO. Recorded teammate VO Unknown.

Locked Saturday VIDEO (~10 min) — owner notes 2026-09-05 / #97. Not “pick one of A / B / C.”

  1. Team + ID verification — ~30s — shared
  2. Website demo https://cafe.artof.link/ — ~3 min — Meghna — Home, Gallery, Menu, Reservations — pack: Meghna demo
  3. Architecture + Diagram (Variant B) — ~3 min — Claude Part 3 — camera natural script
  4. Coding rationale (Variant C) — ~3 min — Hiren Part 4 — camera natural script
  5. Shared close — shared — camera natural script

Casting: Meghna Part 2 UX · Claude Part 3 Architecture (Variant B) · Hiren Part 4 Coding (Variant C). Voice-over is TBD. Meghna’s 3-minute pack: Meghna demo. Per-part pack (script + prototype video + VO TBD) lives on Saturday. Supporting docs target 9:00 America/New_York on 2026-09-06.

Sister talk-track pages (stay complete):

The Zoom dry-run is not the Quantic submission. Do not submit it until a live must-film pass plus voice exists. That final submit cut is Unknown / to-be-filled.

TrackJob (known)Not (honest)
CoverageFR/NFR evidence map (grade floor)A claim that every NFR is met
Talk / video / must-filmLocked five-part structure; Meghna P2 / Claude P3 / Hiren P4; must-film page exists; dry-run is PROTOTYPEA finished Quantic upload; a voice-over

4. Honesty (known now — say out loud)

5. Still Unknown / to-be-filled (sections kept on purpose)

Do not invent these. The section exists so a grader sees the gap instead of a guessed yes.

ItemStatus now
Final Quantic submission video (live must-film + voice)Unknown / to-be-filled. Dry-run on the Video script is PROTOTYPE only.
Voice-over (teammate recorded)TBD on every part. PROTOTYPE TTS on materials is not that.
Optional Claude advance recording for evalUnknown until a file exists. Not the submit video.
Sunday meeting start clockUnknown / to-be-filled. Known job: ends with a recording; docs target 9:00 America/New_York on 2026-09-06. Page: Sunday.
Outbound newsletter mailNot in the SRS MVP. Do not claim a mailer.
Permanent cafe.artof.link hostingFuture #22. Staging does not close it.
Collaborator quantic-graderOwner step. An agent must not add that person.
Live GET of this handoff page on PagesUnknown until after merge / deploy.

Meeting packs

Back to the Quantic / MSAIE hub.